中文版 ENGLISH
NEWS
NEWS Your current location:Home > News
Together with Baosteel Energy, Dongfang Hitachi to Implement the Users’ Integration Photovoltaic Generation Project2013-04-16

Recently, a supply contract of photovoltaic inverters with a total capacity of 20MWp was signed between Dongfang Hitachi and Shanghai Baosteeel Energy Tech Co., Ltd., Dongfang Hitachi will supply photovoltaic inverters, lighting protection array combiner boxes and other ancillary facilities for the 20 megawatt users’ integration photovoltaic generation project in Beilun District, Ningbo City.
 

A total area of about 190 thousand square meters of unused roof owned by Ningbo Iron and Steel and Ningbo Baoxin Stainless Steel will be utilized for the construction of the project which has been listed in the Second Batch of National Golden Sun Programme and currently the roof photovoltaic generation project with maximum investment and capacity in Beilun District, Ningbo City. The annual generated energy by the project will be 21 million kWh after completion with a remarkable social benefits, which can annually reduce 7645 tons of standard coals, reduce the emission of SO2 about 183 tons and NO2 about 58 tons.
 

Dongfang Hitachi (Chengdu) Electrical Control Equipment CO., LTD 蜀ICP备11011855号
Power by:35.com